GM Defense’s EPIQ hybrid power system powered two 4th Infantry Division command nodes during Project Convergence Capstone 6 at Fort Irwin, California. The system sustained 9 to 30 kilowatts of mission-critical load for three to eight hours without running the generator continuously. Two U.S. Army command posts have run for up to eight hours straight on battery power alone, no generator rumbling in the background, no engine noise giving away their position, proving a defense contractor’s hybrid power system can…
Continue reading with a subscription
This article is available to subscribers. Subscribe to read it in full, or sign in if you already have an account.